发表于 31-1-2011 00:31:32|来自:新加坡
|
显示全部楼层
songqx903 发表于 30-1-2011 13:10
哦、、哦、、
真的太谢谢了,这样改了读起来真的很专业啊,麻烦那位朋友了,感激!!! ...
剩余部分的:
c) The reinforcement cages shall be fabricated in strict and complete compliance with the inspection standard. The cost of any work in delay of construction shall be fully covered by sub-contractor. Fine of USD50 shall be executed for any reinforcement cage of 9 meters not complying with inspection or rejected y authority requirement.
d) Ensure safety in construction, all workers shall wear insulated boots, shoes when operating in rainy or humid areas, otherwise all the consequences resulting therefrom borne by sub-contractor (including economic loss)
e) The sub-contractor shall save the quantity of reinforcement, in such way that all rebar shall be arranged rationally, any reinforcement bars over 1 meter shall be rationally used. If the material excess, it has nothing to do with sub-contractor.
f) The sub-contractor must ensure to complete fabrication of 60 numbers (12 sets) of reinforcement cage, any cost of delay due to shortage of qualified reinforcement cage will be charged to sub- contractor.
6.0 OTHER CONDITIONS
a) The sub-contractor shall be fully responsible for the safety of his workers.
b) Construction safety and etc. should according to the relevant regulations made by main contractor.
c) Matters not covered in this agreement shall be negotiated by both parties settlement.
d) Any notice received from supervision, HEPEC or MOE caused by the sub-contractor, USD200 will be fined each. Any fines received from supervision, HEPEC or MOE caused by the sub-contractor, shall be borne entirely by the sub-contractor.
e) This agreement is in quadruplicates, each Party holds two copies, effective after signature and stamp. Project completion and payment settlement of natural failure.
|
|