Agreement
Party: Wuhan Guo machine Geotechnical Engineering Co., Ltd. a German power plant projects in Iraq and China Ministry of
B:
Party construction projects because of needs, a German power plant projects in Iraq and China pile reinforcement cage processing sub-projects to the B production, as the clear responsibility of both parties, entered into an agreement special rules as follows:
I. Project Location: Iraq Vasile special
Second, project content: bored pile reinforcement cage into the cage.
Third, the unit price, measurement and payment:
15,000 dinars as a unit / section (ten thousand thousand dinars each section, each section length of 9 meters), measured way in real measurement, the daily number of completed section of the reinforcement cage by the A and B sides confirmed the signing day ; payment as the 1st pay 70% of the workload, and the rest to be completed pile acceptance of a settlement.
Fourth, Party A:
1, is responsible for production of reinforcement cage space, power supply, check and acceptance, and reinforcement cage to assist in handling the orifice.
2, responsible for providing reinforcement of the original material, electrodes, welding machine 10.
3, Party A is responsible for the installation of reinforcement cage.
V. Responsibilities of Party B:
1, B-owned, including welding gloves, helmets, etc., all the welding equipment and tools and materials; Party to provide the tools, machinery, Party B shall take good care of, all damage, loss, etc., from the B repair, compensation.
2, welders required certificates;
3, welded into a cage must meet the inspection standard operating procedure, or rework the losses caused by Party B is responsible, (each section of the reinforcement cage does not meet the test specifications, penalties $ 50).
4, B necessary to ensure safety in the construction, operation in rainy or humid areas wear insulated boots, shoes, otherwise all the consequences resulting therefrom borne by Party B (including economic loss).
5, B in the construction process seriously ingredients, and then one with a reasonable meters above the material used, if the excess material is nothing to do with the Party.
6, the Party must ensure that the daily processing of 60 (12 sets), cage, or due to insufficient number of qualified steel cage for all the losses caused by Party B shall bear.
Sixth, other:
1, B for all workers, full assume responsibility for security by the party.
2, according to civil construction and other relevant provisions of the total package;
3, matters not covered in this agreement, both parties through consultation;
4, B causes as a result of receiving supervision, HEPEC, MOE types of notice, each fine
$ 200; B causes as a result of receiving supervision, HEPEC, MOE all kinds of fine single, fully responsible for the B
5, this agreement is in quadruplicates, each Party holds two copies, signed and effective completion of project payment to settle the natural failure.